• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar
  • Skip to footer
  • My Account
  • Subscribe
  • Log In
Itemlive

Itemlive

North Shore news powered by The Daily Item

  • News
  • Sports
  • Opinion
  • Lifestyle
  • Police/Fire
  • Government
  • Obituaries
  • Archives
  • E-Edition
  • Help
This article was published 14 year(s) and 2 month(s) ago

Feasibility study favors wind turbine project in Swampscott

[email protected]

July 28, 2011 by [email protected]

SWAMPSCOTT – A draft study presented to the Renewable Energy Committee concludes that an approximately 350-foot-tall commercial wind turbine could capture enough wind to reduce energy costs at the middle school and Little League fields without creating noise in excess of state limits.But the study’s author said that the town has a long process ahead if it wants to erect any turbine.”This is just a first step to determine if the site is viable or not,” study author Jonathan Markey of Meridien Associates said recently. “The town still has a significant amount of work to do if this is something they want to do ? we’re really not that close to just putting a turbine up. This is the very, very first step.”The town received a $75,000 grant last year to do a feasibility study on erecting a wind turbine just beyond the baseball diamonds at Forest Avenue – one of four sites examined by the Renewable Energy Research Laboratory at University of Massachusetts Amherst in 2008 for local wind projects. The recent study examined the site’s wind resource, access and other physical characteristics, and the noise impacts of a proposed turbine, said Assistant Town Engineer Victoria Masone.Markey said that the wind strength and consistency was “favorable” for a commercial scale project, but the sound requirements set by the state Department of Environmental Protection limited the size of the turbines to 750 kilowatt (kW) and 900 kW models. These are approximately 350 feet tall at the tip of the highest blade, Markey said. He said that this was approximately 50 feet taller than the turbine at Newburyport, but 50 feet shorter than the turbine at Ipswich.Renewable Energy Committee Chair Neal Duffy said that the committee was surprised the site could accommodate the 900 kW model.”It is probably the optimal turbine for the site and when still drafting the report, it was going to be a 650 kW as the recommended size,” Duffy said. He said that although the 900 kW model is 5 meters (or 16.4 feet) taller, it is “quieter and produces a lot more power.”

  • cmoulton@itemlive.com
    [email protected]

    View all posts

Related posts:

No related posts.

Primary Sidebar

Advertisement

Sponsored Content

Make Flashcards From Any PDF: Simple AI Workflow for Exams

Solo Travel Safety Hacks: How to Use eSIM and Tech to Stay Connected and Secure in Australia

How Studying Psychology Can Equip You To Better Help Your Community

Advertisement

Upcoming Events

11th Annual Lynn Tech Festival of Trees

November 16, 2025
Lynn Tech Tigers Den

38 SPECIAL

December 13, 2025
Lynn Auditorium

5th Annual Brickett Trunk or Treat

October 23, 2025
123 Lewis St., Lynn, MA, United States, Massachusetts 01902

98°

December 5, 2025
Lynn Auditorium

Footer

About Us

  • About Us
  • Editorial Practices
  • Advertising and Sponsored Content

Reader Services

  • Subscribe
  • Manage Your Subscription
  • Activate Subscriber Account
  • Submit an Obituary
  • Submit a Classified Ad
  • Daily Item Photo Store
  • Submit A Tip
  • Contact
  • Terms and Conditions

Essex Media Group Publications

  • La Voz
  • Lynnfield Weekly News
  • Marblehead Weekly News
  • Peabody Weekly News
  • 01907 The Magazine
  • 01940 The Magazine
  • 01945 The Magazine
  • North Shore Golf Magazine

© 2025 Essex Media Group